standardized under PDI, MoPR may consider how to draw data
for NPA from LIF-PDI, as the Indicators of NPA and LIF for
PDI have both overlap and differences.
Data validation mechanisms should be based on what suits best
for that kind of data. Where additional data from the same
source used by the Ministry is to be picked up for the LIF, the
same validation mechanism already existing can be used. So, if
indicators are included in MA, the MA data validation
mechanism will take care of them. Where it is only GP and no
links to existing portals, or data source, the system like the
Bangla Paira Baithk can be used, or such other suitable
mechanism, that validates and ensures data quality.
Till such time as the APIs are through, once the data is entered troubles with the data collection mechanism. Once the physical
by field level data collectors, the entire process of data forms are validated as decided, data entry shall be done in the
validation needs to be performed digitally with a legally valid eGramSwaraj portal. To render additional credibility to the
Digital Signature Certificate (DSC) or other secure institution of PDI, the system may be designed to mandate the
authentication mechanisms from the data custodian in the first user to upload signed and stamped copies of physical forms as
instance which effectively certifies correctness of data entered, supporting document at the time of data entry. This measure
and then goes for data validation. will also aid officials at various levels, including the Central
In case the choice is for physical data collection forms, the data Government, to check data in case any discrepancy is observed
collector must have all the forms duly signed, stamped and or even as random, sample-based data quality check. Wherever
authorized from the concerned data custodian. For data points relevant, geo tagging of an asset can also be considered to make
which are available across various agencies, such as Number of the entire data collection process robust e.g.: Whether the
Households in a Gram Panchayat, the data collector can Anganwadi has a Nutrition Garden or not and Whether the
compare information available across agencies and bring the Health Sub Centre has boundary wall and gate or not, ramp in
discrepancy, if any, to notice . However, it must be decided as School etc. Wherever, this is already available in the Data
to which source is to be used when such multiple sources are portals of different Ministries, these can be part of the data
there and this must be applicable across all GPs, and given in sharing. MoPR already has set up Gram Manchitra for capturing
the instructions for Data collection. Before data is uploaded, the various infrastructure and assets of the GP. Just as data
Data Validation by the identified official / Panchayat sharing of numbers is done, the visual data of geotagged assets
committee/ group of persons in the Gram Panchayat/ Ward or and GIS maps of different schemes needs to be shared.
area-based meeting, to ensure additional checks and balances To Decentralize and compartmentalize this entire process of
along with comprehensive inclusion of all critical stakeholders, data validation, and to ensure that the quality of field data is
can be suitably built. Such a sound validation process will lend maintained at the highest levels possible, following indicative
due credibility to the entire data collection process and the
measures can be adopted:
institution of PDI. Further, these forms will also become the
data documents of that particular Gram Panchayat. Basic Data Entry Level Validation: To ensure end-to-end
Additionally, such an approach will also help in fine tuning the digitization of the entire PDI computation process, the field
entire data collection system and addressal of any teething level data collector, who will facilitate collection of data
PDI Committee Report - 2023: Data 41