Page 293 - PDI Vol 2
P. 293
ANNEXURE - IV
Proof of Concept Annexures
Proof of Concept (PoC) Annexures provides the calculations based on the methodology using the data collected as per
the indicators and sub-indicators listed in the Local Indicator Framework (LIF) from the listed Data sources as per the
LIF. This gives the Indicator value for each of the 577 Indicators under the 9 Themes. It gives the Thematic scores, and
brings out the Panchayat Development Index (PDI) for the GP. It provides the calculations by which the average scores
of the Indicators, Themes and the composite score of PDI for the Block and District, and State level have been arrived at.
This also gives the comparative position of different GPs, and forms the basis for taking up various analysis, by bringing
in further data Tables as required for such purposes. To demonstrate this, the PoC exercise was undertaken covering 30
Gram Panchayats in the State of Maharashtra. The Annexure – I has the Team that has done this first of its kind work at
such large volume of data collection with very basic technical and backend software, providing the country the proof of
what is possible and removed all doubts on numbers of indicators and data points that can be collected in the field.
Further refinements of data entry formats and back-end software for calculations is required for upscaling this. The data
entry formats used, calculations and basis are provided in the Tables and the Annexures (sub-annexures) to this Main
Annexure IV of the Report, which consists of 9 sub-annexures, i.e., Annexure IV-A to Annexure IV-I, details of which
are as under:
Annexure IV-A: Indicative list for Data Analysis
Annexure IV-B: Data Entry Formats used for the Field data collection in Maharashtra
Annexure IV-C: Resource Envelope of 30 GPs
Annexure IV-D: Calculation Tables provided in link (Table 1 to 14)
Annexure IV-E: List of Null Value Indicators
Annexure IV-F: List of Indicators to be collected by Survey
Annexure IV-G: Thematic Scores and Sankalp
Annexure IV-H: Data Analysis presentation by NIC including flow chart for web system
Annexure IV-I: PDI LIF Data Collection Team of Maharashtra
268
PDI Committee Report - 2023: Annexure-IV